1.
Erlina E, Subagyo S, Iskandar M, Setiawan G. ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PONDASI BORED PILE TERHADAP PONDASI SUMURAN (STUDI KASUS: PROYEK PEMBANGUNAN KOST 3 LANTAI DI POTRONANGGAN TAMANAN BANGUNTAPAN BANTUL). CivETech [Internet]. 1Aug.2023 [cited 12May2024];5(2):1 -9. Available from: https://jurnal.ucy.ac.id/index.php/CivETech/article/view/1894