Erlina, Erlina, Singgih Subagyo, Muhammad Ryan Iskandar, and Ganang Eko Setiawan. “ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PONDASI BORED PILE TERHADAP PONDASI SUMURAN (STUDI KASUS: PROYEK PEMBANGUNAN KOST 3 LANTAI DI POTRONANGGAN TAMANAN BANGUNTAPAN BANTUL)”. Civil Engineering and Technology Journal 5, no. 2 (August 1, 2023): 1–9. Accessed April 30, 2025. https://jurnal.ucy.ac.id/index.php/CivETech/article/view/1894.