Suharyanto, Indra, and Sigit Erfanto. “ANALISA PENAMBAHAN JAM KERJA LEMBUR TERHADAP EFISIENSI BIAYA SEWA ALAT- ALAT BERAT PADA PROYEK KONSTRUKSI (Studi Kasus Pada Proyek Pemecah Gelombang Glagah Bagian Timur, Kabupaten Kulon Progo, DIY)”. Civil Engineering and Technology Journal, vol. 2, no. 2, Aug. 2020, pp. 24-36, doi:10.47200/civetech.v15i2.719.