[1]
E. Erlina, S. Subagyo, M. R. Iskandar, and G. E. Setiawan, “ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PONDASI BORED PILE TERHADAP PONDASI SUMURAN (STUDI KASUS: PROYEK PEMBANGUNAN KOST 3 LANTAI DI POTRONANGGAN TAMANAN BANGUNTAPAN BANTUL)”, CivETech, vol. 5, no. 2, pp. 1–9, Aug. 2023.