Suharyanto, Indra, and Sigit Erfanto. 2020. “ANALISA PENAMBAHAN JAM KERJA/LEMBUR TERHADAP EFISIENSI BIAYA SEWA ALAT- ALAT BERAT PADA PROYEK KONSTRUKSI (Studi Kasus Pada Proyek Pemecah Gelombang Glagah Bagian Timur, Kabupaten Kulon Progo, DIY)”. CivETech 2 (2), 24 - 36. https://doi.org/10.47200/civetech.v15i2.719.