Erlina, E., Subagyo, S., Iskandar, M. R., & Setiawan, G. E. (2023). ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PONDASI BORED PILE TERHADAP PONDASI SUMURAN (STUDI KASUS: PROYEK PEMBANGUNAN KOST 3 LANTAI DI POTRONANGGAN TAMANAN BANGUNTAPAN BANTUL). CivETech, 5(2), 1–9. https://doi.org/10.47200/civetech.v5i2.1894