[1]
ErlinaE., SubagyoS., IskandarM. and SetiawanG. 2023. ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN PONDASI BORED PILE TERHADAP PONDASI SUMURAN (STUDI KASUS: PROYEK PEMBANGUNAN KOST 3 LANTAI DI POTRONANGGAN TAMANAN BANGUNTAPAN BANTUL). CivETech. 5, 2 (Aug. 2023), 1 - 9. DOI:https://doi.org/10.47200/civetech.v5i2.1894.