[1]
Suharyanto, I. and Erfanto, S. 2020. ANALISA PENAMBAHAN JAM KERJA/LEMBUR TERHADAP EFISIENSI BIAYA SEWA ALAT- ALAT BERAT PADA PROYEK KONSTRUKSI (Studi Kasus Pada Proyek Pemecah Gelombang Glagah Bagian Timur, Kabupaten Kulon Progo, DIY). CivETech. 2, 2 (Aug. 2020), 24–36. DOI:https://doi.org/10.47200/civetech.v15i2.719.